• Client: Whitbread PLC
  • Architect: Axiom Architects
  • Duration: January 2016 - October 2018
  • Contract value: £8.8m
Download Case Study

The works include alterations of an existing building, maintaining the front façade and the construction of a 61 bed HUB Hotel which spans over a basement and seven floors. The site is located in an extremely busy part of London with all streets having to maintain pedestrian access ways at all time.