• Client: HSE North West
  • Architect: Reddy Architecture
  • Quantity Surveyor: Kane Crowe Kavanagh Limited
  • Duration: July 2013 - August 2014
  • Contract value: £3.4M
Download Case Study

Construction of an Interconnected Primary Care Centre and Care Managed Unit with Shared main entrance, ancillary and administrative facilities on a 3.0 hectare Green field site at Ballinamore, Co. Leitrim. The overall floor area of the building is 1840m².

The building is single storey construction with pitched roofs on load bearing walls. Steel framing was used in areas where there was a large extent of glazing or clear openings. Civil Works, Car parking, associated roads and drainage were included in the contract.

The Care Managed unit includes:

  • A commercial kitchen and kitchen stores with kitchen staff changing rooms
  • Sitting and Dining rooms
  • Treatment room
  • Bathroom
  • Hair and Beauty room
  • Prayer room
  • Laundry
  • Sluice rooms
  • Toilets
  •  Nurses Station and Nursing staff changing area

The Primary Care Centre includes:

  • A reception area
  • G.P. clinic rooms
  • Practice Nurse Rooms
  • Minor injuries room
  • PHN treatment rooms
  • PHYSIO/OT treatment rooms and multi-displinary rooms
  • A Day services with patient shower/changing area and coffee dock were provided as part of the building
  • A courtyard garden was provided for residents

The contract included the complete Mechanical and Electrical Works associated with the construction of the Building. A park land amenity with a gravel path and a bridge over a stream was created on the western side of the site.