Nortel European Data Centre

Client: Nortel European Data Centre
Architect: Garett McKee Tebbot & Wells Limited
Contract value: €1m
Description:
The works comprise the formation of a European Data Centre within the vacant Warranty Area in the main building at Doagh Road, Monkstown, Belfast. 
 
The works included;
  • Formation of 250m2 of main data centre within the existing ground floor area.
  • Formation of a fire exit to the adjoining area
  • Lifting of raised floors and installation of data cabelling to the adjoining Comms Room.
  • Cable links to the existing electric generator via an under ground cable duct.
  • Installation of condensers on the low level roof above the data centre.
  • Relocation of existing UPSs from the current data centre loaction in Harlow, Essex. 
 
The ability to complete the works in a short programme period within disruption of on going activity was of the utmost importance.