• Client: Danone
  • Duration: January 2016 - December 2016
  • Contract value: €3.9m
Download Case Study

The project consists of the Erection of a New Production Area Over the Existing Intake Facility, including Access and Electrical Control Rooms and the Refurbishment of the Existing Drying Tower which includes the Replacement of some of the Existing Floors and the Construction of a New Roof and High Level Walkway between Drying Tower 1 and Drying Tower 2.