• Client: L & S Flemming
  • Architect: Knox & Clayton
  • Quantity Surveyor: Eamon Traynor
  • Duration: November 2003 - December 2004
  • Contract value: €4.5M
Download Case Study

The works consist of 3 No. phases of work which incorporates the extension/replacement of the existing supermarket, additional 3rd part retail units and residential accommodation comprising of 5 No. Townhouses.

Phase 1: Involved the demolition of the existing boundary walls and shed, the relocation of the existing services and the construction of a basement and 3 storey extension incorporating dock levellers, storage areas and townhouses in the top 2 storeys.

Phase 2: Involved the demolition of the existing rear entrance and rear store and the construction of a 3 storey extension. Shop located on ground floor and townhouses on the top 2 storeys.

Phase 3: The construction of a 3 storey extension comprising of townhouses.

Construction was of concrete retaining walls to basement, steel frame structure, hollowcore floors, enclosed by traditional masonry walls with a combination of clad and tiled roof.