• Client: Grangegorman Development Agency
  • Architect: Taylor Architects
  • Quantity Surveyor: AECOM
  • Duration: October 2013 – May 2014
  • Contract value: €4.7M
Download Case Study

The works involved the refurbishment of the existing building relating to Structure 8.

The works consisted of internal alterations which entailed:

  • The removal of existing partitions and the provision of new internal partitions
  • The replacement of ceilings
  • The upgrade of corridors, stairs and floors to improve the fire performance of the structures
  • The provision of new doors
  • The provision of new floor finishes
  • The provision of new mechanical and electrical services
  • The provision of new toilet facilities
  • The refurbishment of existing windows
  • The refurbishment and repairs to the roofs and roof structure.
  • The provision of a new glazed main entrance to structure 08.

There was a requirement to upgrade the Building’s Fire proof, health and safety and insulation qualities to modern day standards for a public building while maintaining and highlighting the old structure.