• Client: Beaumont Hospital
  • Architect: Moloney O'Beirne Architects
  • Duration: January 2016 - January 2017
  • Contract value: €8.3m
Download Case Study

The works comprised of the First Floor Fit-Out of the Existing Acute Psychiatric Unit, which includes a Haemodialysis Unit and a separate Mental Health Unit. The Ground Floor of the 44 bed Acute Psychiatric Residential Unit remained occupied and fully operational for the duration of the project. The existing hospital and campus also remained live for the duration of the works. The Fit-Out Works and construction of the New covered Link Bridge and cores ensures all blue light emergency and vital hospital services and circulations are maintained.